St Ambrose High School, Buchanan High School and Townhead Community Centre

The £44m development comprising of Buchanan High School – formally Drumpark High School – St Ambrose High School and Townhead Community Centre opened in November 2012.

Date

2012

Client

North Lanarkshire Council

Value

£44m

The building has been designed to be part of the park and has south facing courtyards relating to both the adjacent landscape and different areas of the building. The design is deliberately low lying, being predominantly two storeys, and the transparency of the principal social spaces allows users to view the park through the building.

A clear and strategic emphasis has been placed on the main entrances – the entrances form prominent features on the front elevation.  Each element of the building has its own identifiable entrance pod: they have been carefully considered in order to provide equal importance, whilst creating a separate visual identity for each part of the building.

Project gallery

Below are a selection of images from this project along with a description. Tap an image and it will appear fullscreen with a close button. There will also be the option to view the next image in the gallery.

The Challenge

Co-locating two high schools and a community centre in a parkland setting. Buchanan High School is a non-denominational school, it caters for young people with a range of additional support needs. St Ambrose High School was relocated from its existing building to this site bordering Drumpelier Country Park.

The Solution

Key features include a two-storey central hub containing dining and social areas for both schools. This space is transparent to both the north and south, allowing views into, out of, and through the building to the landscape beyond. The space can also be used as a gathering area for entrance into the assembly hall for whole school or after-hours events.

The Outcome

“The new school is absolutely wonderful and has exceeded all our expectations. Our pupils and staff are just amazed at how good it is. I think everyone will really look forward to turning up to school each day.The campus offers a stimulating, creative environment for our pupils, making high quality learning and teaching possible.”

Ellen Douglas, Head Teacher of St Ambrose High School

Related Projects

Saddleworth High School

Saddleworth High School

Saddleworth High School New build 10FE High School which comprises of a new 10FE High School for ages 11 to 16 with for a total number of 1,500 pupils. The total built floorspace equates to 10,500...

3D Visualisation

3D Visualisation

3D Visualisation We can provide a range of 3D visualisation services to help you get your crucial presentation right.Working with 3DS Max and Photoshop, our team can create high quality 2D images...

Linkwood Primary School

Linkwood Primary School

Linkwood Primary School Linkwood Primary School located in South Elgin, is a new build school on a greenfield site located within a wider masterplan for the expansion of Elgin. Linkwood is a new...

Locations

Edinburgh

64 Queen Street
Edinburgh
EH2 4NA

0131 464 6100
edinburgh@jmarchitects.net

Glasgow

50 Bell Street
Glasgow
G1 1LQ

0141 333 3920
glasgow@jmarchitects.net

London

Second Floor
37 Alfred Place
London WC1E 7DP

0207 580 5330
london@jmarchitects.net

Manchester

3A, 54 Princess Street
Manchester
M1 6HS

0161 200 6300
manchester@jmarchitects.net