Roundhay Primary Campus, Leeds

Roundhay Primary Campus is a two form entry school, providing the lower years for a ‘through’ school. Built in the Roundhay conservation area in the green belt close to Leeds, the project was delivered under Leeds City Council’s off-site fabrication framework and brought into use in March 2013.

Date

2013

Client

Premiere Interlink for Leeds City Council

Value

£4.6m

Forming the second location for Roundhay School Technology & Language College, this 2 form entry primary facility accommodates 420 pupils, located in the green belt and the Roundhay Conservation area giving a pupil age range of nursery to 18.

The level difference on site enables the school to gain direct access to the play spaces and landscaping from both floor levels turning a challenge into a distinct positive. Natural stack ventilation and good insulation levels create the right environment for the classrooms being delivered to factory quality standards.

Internally the layout of the building responds to the functional brief for the school, key areas being the classrooms themselves which require good environmental design to create the best conditions for learning. The classrooms are therefore arranged on two floors either side of the circulation spaces through the building.

Project gallery

Below are a selection of images from this project along with a description. Tap an image and it will appear fullscreen with a close button. There will also be the option to view the next image in the gallery.

The Challenge

Delivery of a two stream primary school in a 26 week programme combined with the challenges of a modular fabrication process. On a ‘Green Belt’ site sloping some 15metres across its section.

The Solution

The design has been evolved with Children’s Services and was constructed under the ‘Leeds Basic’ framework utilising off-site modular construction to achieve challenging cost and programme targets whilst giving a fully bespoke high quality solution to this sensitive and steep site.

The Outcome

This approach has been acknowledged by CABE, Leeds Council & Manchester Council. Following the completion of this school jmarchitects have been appointed on a further four off site fabricated primary schools in the NW under a PSBP Capital Funded programme.

Related Projects

Lochside Academy

Lochside Academy

Lochside Academy The new Lochside Academy is located on the southern edge of Aberdeen, at the heart of a large regeneration masterplan. The new 14,450m2 campus replaced the existing Torry and...

Financial Services Hybrid Working

Financial Services Hybrid Working

Financial Services Hybrid Working jmarchitects supported our client through a change in working culture that was triggered by the Covid-19 pandemic and assisted with the subsequent implementation...

Elgin High School

Elgin High School

Elgin High School The new build 10,200m² Elgin High School was designed to respond to the Curriculum for Excellence agenda and promotes a progressive culture of learning, enhancing links between the...

Locations

Edinburgh

64 Queen Street
Edinburgh
EH2 4NA

0131 464 6100
edinburgh@jmarchitects.net

Glasgow

50 Bell Street
Glasgow
G1 1LQ

0141 333 3920
glasgow@jmarchitects.net

London

Second Floor
37 Alfred Place
London WC1E 7DP

0207 580 5330
london@jmarchitects.net

Manchester

3A, 54 Princess Street
Manchester
M1 6HS

0161 200 6300
manchester@jmarchitects.net