jmarchitects worked with Leytonstone School from feasibility stage through to completion of the project on site in 2016. The project included the retention of a locally listed building, selective demolition and refurbishment of other blocks on the campus and the construction of a new mixed use teaching block together improved external social spaces.

Date

2016

Client

London Borough of Waltham Forest / Bouygues UK

Value

£10.7m

The school is located within a conservation area at the edge of Epping Forest. in 2008 jmarchitects began preparing an Outline Business Case for the school as part of the BSF programme. We were closely involved in the detailed consultation with teachers, governors, parents, pupils and the public. The scheme was shelved when the BSP programme was cancelled by the Government, however the Borough found alternative funding enabling the project to proceed.

 The position of the new building and the landscaping were carefully considered as a masterplan to deliver maximum benefit to the school. The improved layout creates new play space, removes bottlenecks and designs our supervision black-spots. Carefully detailed changes in level ensure the site is fully accessible to all and leaves no unused space. The modern clean architecture mediates between the historic buildings on the site, the backdrop of Epping forest and the busy thoroughfare of James Lane.

The new multi use building creates 3015m2 of new floor area, providing 19 new classrooms, laboratories, workshops and studios for music and drama. A new dining area is created at ground floor wrapped in glazing to maximize views to the play areas, becoming a focal point for the social space.

Project gallery

Below are a selection of images from this project along with a description. Tap an image and it will appear fullscreen with a close button. There will also be the option to view the next image in the gallery.

The Challenge

To regenerate the school campus to provide teaching and support spaces which will help the school deliver outstanding education in an inspiring school environment

The Solution

The design developed a site masterplan, re-using buildings where possible, demolishing those beyond repair and constructing a new building providing new teaching and support spaces within a reconfigured site.

The Outcome

The architectural moves on the site create buildings which are responsive to the urban context and a campus which is legible, cohesive and inspiring.

Related Projects

Saddleworth High School

Saddleworth High School

Saddleworth High School New build 10FE High School which comprises of a new 10FE High School for ages 11 to 16 with for a total number of 1,500 pupils. The total built floorspace equates to 10,500...

3D Visualisation

3D Visualisation

3D Visualisation We can provide a range of 3D visualisation services to help you get your crucial presentation right.Working with 3DS Max and Photoshop, our team can create high quality 2D images...

Linkwood Primary School

Linkwood Primary School

Linkwood Primary School Linkwood Primary School located in South Elgin, is a new build school on a greenfield site located within a wider masterplan for the expansion of Elgin. Linkwood is a new...

Locations

Edinburgh

64 Queen Street
Edinburgh
EH2 4NA

0131 464 6100
edinburgh@jmarchitects.net

Glasgow

50 Bell Street
Glasgow
G1 1LQ

0141 333 3920
glasgow@jmarchitects.net

London

Second Floor
37 Alfred Place
London WC1E 7DP

0207 580 5330
london@jmarchitects.net

Manchester

3A, 54 Princess Street
Manchester
M1 6HS

0161 200 6300
manchester@jmarchitects.net