Cowes Enterprise College

A perfect synthesis was created between the demands of the brief and the opportunities of the site. Concept, form and structure marry well, providing an innovative educational solution with aesthetic benefits and a cost-effective, buildable solution.

Date

2013

Client

Isle of Wight Council

Value

£24.5m

Set on a hilltop with panoramic views across the Isle of Wight and out to sea, the site for the new Cowes Enterprise College is stunning. Our design concept involved a “hilltop village” with clusters of volumes and roof forms echoing those of a medieval settlement. While analysing the potential of the brief, it became apparent that this initial concept was ideally suited to the clustering of educational spaces envisaged within a series of departments based around internal and external courtyards.

A perfect synthesis was then created between the demands of the brief and the opportunities of the site. The key spaces are planned around ‘inspiration zones’ that are accessed from the centrally placed entrance hall. The inspiration zone connects to a covered courtyard and dining area in one direction, whilst, in the other, a moving wall allows complete connection to the games hall for performance and sport.

Project gallery

Below are a selection of images from this project along with a description. Tap an image and it will appear fullscreen with a close button. There will also be the option to view the next image in the gallery.

The Challenge

This project entailed linking two campuses within one building: the “Gateway Village” for 11-14 year olds and a “Learning Centre” for 14-19 year olds. In addition, it was important that the wider community benefit from the physical presence of the school in the neighbourhood.

The Solution

Inspired by the notion of the ‘hill-top village’ with its clear identity, profile and boundary, our design incorporates a series of internal and external courtyards that will create a number of destinations, gathering places, teaching spaces and points of interest within the school.

The Outcome

We developed a learning environment significantly improved from what was originally envisaged, and links from education to enterprise mean that the learning resource centre will be able to support wider community use. In addition, our innovative construction solutions offered significant construction advantages.

Related Projects

Saddleworth High School

Saddleworth High School

Saddleworth High School New build 10FE High School which comprises of a new 10FE High School for ages 11 to 16 with for a total number of 1,500 pupils. The total built floorspace equates to 10,500...

3D Visualisation

3D Visualisation

3D Visualisation We can provide a range of 3D visualisation services to help you get your crucial presentation right.Working with 3DS Max and Photoshop, our team can create high quality 2D images...

Linkwood Primary School

Linkwood Primary School

Linkwood Primary School Linkwood Primary School located in South Elgin, is a new build school on a greenfield site located within a wider masterplan for the expansion of Elgin. Linkwood is a new...

Locations

Edinburgh

64 Queen Street
Edinburgh
EH2 4NA

0131 464 6100
edinburgh@jmarchitects.net

Glasgow

50 Bell Street
Glasgow
G1 1LQ

0141 333 3920
glasgow@jmarchitects.net

London

Second Floor
37 Alfred Place
London WC1E 7DP

0207 580 5330
london@jmarchitects.net

Manchester

3A, 54 Princess Street
Manchester
M1 6HS

0161 200 6300
manchester@jmarchitects.net