Bolton Central, Bolton
Bolton Central is a key interlinking development which forms part of the wider regeneration of the adjacent High Street Works (also by jmarchitects) and the developing Bolton Transport Interchange.
Date
2017
Client
PSP Bolton LLP
Value
£6.1m
Bolton Central, looked to create a highly legible plan form with a simple programme of spaces to respond directly to the clients brief and a flexible/adaptable internal environment to suit potential multi-sector uses. The 28,000ft² of ‘Grade A’ office space provides a bold frontage to a key new public space which will guide people to the developing adjacent transport interchange hub.
The plan form wraps around a secure private landscaped courtyard, along with teared terraces these enhanced spaces offer visual stimulus from within the workspace whilst providing tranquil softer spaces for users to relax away from the office environment contributing to the positive health and well-being of the building occupants. The building form and detailing is designed to enhanced levels of performance, but to also ensure potential future phases to increase floor space could be incorporated at a later date if required.
Floor plates are designed to be flexible allowing for the subdivision of the space to provide for multiple occupants or a single user. Orientated around an efficient shared central access and service core to all five floors, maximising net area and optimising service routes to the floor plates.
JMA took a strong passive approach to incorporating enhanced sustainability principles, best practice floor plate design and consideration for the health and well-being of future occupants. The building is also designed to meet the client requirements for a BREEAM Very Good rated development.
Project gallery
Below are a selection of images from this project along with a description. Tap an image and it will appear fullscreen with a close button. There will also be the option to view the next image in the gallery.
The Challenge
This brief set out the intent to meet the demands for high quality, flexible and sustainable development which would positively reinforce the streetscape and act as a gateway building within the wider regeneration and a catalyst to future development.
The Solution
The solution allowed the provision of 28,000ft² grade A office space with a bold frontage to a key new connecting public space. The building massing would remain sympathetic to the surrounding development while interesting articulation of materials and high levels of sustainability were developed to fulfil and exceed the brief.
The Outcome
The building is orientated and designed around the integration between the internal and external environment, providing a building architecture which is striking yet cohesive and connective with its surroundings. The efficient and open plan floorplates provide for flexible and adaptable uses, achieving BREEAM Very Good and a healthy & exciting working environment for its occupants.
Related Projects
Lochside Academy
Lochside Academy The new Lochside Academy is located on the southern edge of Aberdeen, at the heart of a large regeneration masterplan. The new 14,450m2 campus replaced the existing Torry and...
Financial Services Hybrid Working
Financial Services Hybrid Working jmarchitects supported our client through a change in working culture that was triggered by the Covid-19 pandemic and assisted with the subsequent implementation...
Elgin High School
Elgin High School The new build 10,200m² Elgin High School was designed to respond to the Curriculum for Excellence agenda and promotes a progressive culture of learning, enhancing links between the...