Battery Wharf

Battery Wharf is a mixed tenure residential development, regenerating a brownfield site in central Barking close to the River Roding.

Date

2016

Client

Hampstead Homes (Planning Stage)

Value

£12m

Having identified the regeneration potential of this brownfield site close to the centre of Barking, jmarchitects worked with the owners to find suitable development partners who could help maximise its value.

This former industrial area, well served by road, rail and river links presented a great opportunity for a new residential and creative industries quarter. Our proposals were developed to help reinforce the local masterplan established by The London Thames Gateway Development Corporation who took over planning functions from the London Borough of Barking and Dagenham.

The development was conceived as two black brick boxes, a longer one addressing Abbey Road and the other, perpendicular to the first, addressing the river. The boxes were raised above a plinth of parking and service accommodation, above any flood risk from the River Roding. The external terraces are created by a sinuous white ribbon which wraps the building. As this ribbon travels around the building, it is articulated to specific elements such as points of entry or significant corners which are visible from a distance.

Following grant of consent, the development changed hands several times, and was finally constructed by Quadrant Construction working with RMA Architects whose stage 4 drawings stayed true to the planning intent.

Project gallery

Below are a selection of images from this project along with a description. Tap an image and it will appear fullscreen with a close button. There will also be the option to view the next image in the gallery.

The Challenge

To regenerate a former industrial area in Barking with a high quality residential development that helps to redefine the local context.

The Solution

The development creates a high quality living environment for every dwelling, maximising access to space, light and view. jmarchitects developed a highly contextural response which was granted planning consent by the LTGDC.

The Outcome

The unique, stylish aesthetic creates a tenure blind development, with both buildings are treated equally with identical spaces, materials and details. Now complete the building heals the fragmented streetscape with an enhanced sense of community.

Related Projects

Saddleworth High School

Saddleworth High School

Saddleworth High School New build 10FE High School which comprises of a new 10FE High School for ages 11 to 16 with for a total number of 1,500 pupils. The total built floorspace equates to 10,500...

3D Visualisation

3D Visualisation

3D Visualisation We can provide a range of 3D visualisation services to help you get your crucial presentation right.Working with 3DS Max and Photoshop, our team can create high quality 2D images...

Linkwood Primary School

Linkwood Primary School

Linkwood Primary School Linkwood Primary School located in South Elgin, is a new build school on a greenfield site located within a wider masterplan for the expansion of Elgin. Linkwood is a new...

Locations

Edinburgh

64 Queen Street
Edinburgh
EH2 4NA

0131 464 6100
edinburgh@jmarchitects.net

Glasgow

50 Bell Street
Glasgow
G1 1LQ

0141 333 3920
glasgow@jmarchitects.net

London

Second Floor
37 Alfred Place
London WC1E 7DP

0207 580 5330
london@jmarchitects.net

Manchester

3A, 54 Princess Street
Manchester
M1 6HS

0161 200 6300
manchester@jmarchitects.net