Battery Wharf
Battery Wharf is a mixed tenure residential development, regenerating a brownfield site in central Barking close to the River Roding.
Date
2016
Client
Hampstead Homes (Planning Stage)
Value
£12m
Having identified the regeneration potential of this brownfield site close to the centre of Barking, jmarchitects worked with the owners to find suitable development partners who could help maximise its value.
This former industrial area, well served by road, rail and river links presented a great opportunity for a new residential and creative industries quarter. Our proposals were developed to help reinforce the local masterplan established by The London Thames Gateway Development Corporation who took over planning functions from the London Borough of Barking and Dagenham.
The development was conceived as two black brick boxes, a longer one addressing Abbey Road and the other, perpendicular to the first, addressing the river. The boxes were raised above a plinth of parking and service accommodation, above any flood risk from the River Roding. The external terraces are created by a sinuous white ribbon which wraps the building. As this ribbon travels around the building, it is articulated to specific elements such as points of entry or significant corners which are visible from a distance.
Following grant of consent, the development changed hands several times, and was finally constructed by Quadrant Construction working with RMA Architects whose stage 4 drawings stayed true to the planning intent.
Project gallery
Below are a selection of images from this project along with a description. Tap an image and it will appear fullscreen with a close button. There will also be the option to view the next image in the gallery.
The Challenge
To regenerate a former industrial area in Barking with a high quality residential development that helps to redefine the local context.
The Solution
The development creates a high quality living environment for every dwelling, maximising access to space, light and view. jmarchitects developed a highly contextural response which was granted planning consent by the LTGDC.
The Outcome
The unique, stylish aesthetic creates a tenure blind development, with both buildings are treated equally with identical spaces, materials and details. Now complete the building heals the fragmented streetscape with an enhanced sense of community.
Related Projects
Lochside Academy
Lochside Academy The new Lochside Academy is located on the southern edge of Aberdeen, at the heart of a large regeneration masterplan. The new 14,450m2 campus replaced the existing Torry and...
Financial Services Hybrid Working
Financial Services Hybrid Working jmarchitects supported our client through a change in working culture that was triggered by the Covid-19 pandemic and assisted with the subsequent implementation...
Elgin High School
Elgin High School The new build 10,200m² Elgin High School was designed to respond to the Curriculum for Excellence agenda and promotes a progressive culture of learning, enhancing links between the...