The scheme consists of extensive alterations to the existing structure including partial demolition of the original 1967 structure to the front, demolition of a 3 storey rear block, retention and refurbishment of the existing auditorium and the extension of a new 5 storey rear block plus associated access, servicing and public realm works. Facilities include a new ground floor café, a larger first floor bar and a second floor multipurpose event space to the front, with a new studio theatre and rehearsal space stacked in the new rear block either side of the refurbished main auditorium at the heart of the project.